Waveney District Council

Downloads: Planning policy

The following documents are available for download. Documents in PDF format can be read using Adobe Reader.

MS Word and Powerpoint documents can be read by using their respective applications or any alternatives.

Available downloads

Housing factsheets

This factsheet provides information on housing completions within Waveney.

Factsheet 2011/12 PDF (PDF)

  • Size: 58.34 KB
  • Estimated download time: (56k = 9 secs)

Factsheet 2010/11 PDF (PDF)

  • Size: 52.36 KB
  • Estimated download time: (56k = 8 secs)

Factsheet 2009/10 PDF (PDF)

  • Size: 109.68 KB
  • Estimated download time: (56k = 17 secs)

Factsheet 2008/9 PDF (PDF)

  • Size: 42.18 KB
  • Estimated download time: (56k = 7 secs)

Factsheet 2007/8 PDF (PDF)

  • Size: 41.52 KB
  • Estimated download time: (56k = 7 secs)

Factsheet 2006/7 PDF (PDF)

  • Size: 39.75 KB
  • Estimated download time: (56k = 6 secs)

Biodiversity audits

An audit by Suffolk Wildlife Trust was undertaken on biodiversity in the towns and Kessingland.

Beccles PDF (PDF)

  • Size: 5.86 MB
  • Estimated download time: (56k = 14 mins 38 secs)

Bungay PDF (PDF)

  • Size: 4.92 MB
  • Estimated download time: (56k = 12 mins 18 secs)

Halesworth PDF (PDF)

  • Size: 5.91 MB
  • Estimated download time: (56k = 14 mins 47 secs)

Kessingland PDF (PDF)

  • Size: 3.4 MB
  • Estimated download time: (56k = 8 mins 30 secs)

Lowestoft Part 1 PDF (PDF)

  • Size: 10.36 MB
  • Estimated download time: (56k = 25 mins 53 secs)

Lowestoft Part 2 PDF (PDF)

  • Size: 11.52 MB
  • Estimated download time: (56k = 28 mins 47 secs)

Southwold and Reydon PDF (PDF)

  • Size: 4.64 MB
  • Estimated download time: (56k = 11 mins 35 secs)

Cumulative Land Raising Study

An analysis of potential impacts on the tidal flood cell of Lake Lothing, Lowestoft as a result of proposed land raising scenarios for several regeneration sites.

Main Document PDF (PDF)

  • Size: 1.31 MB
  • Estimated download time: (56k = 3 mins 17 secs)

Appendix A Scenario 1 PDF (PDF)

  • Size: 7.52 MB
  • Estimated download time: (56k = 18 mins 47 secs)

Appendix A Scenario 2 PDF (PDF)

  • Size: 7.55 MB
  • Estimated download time: (56k = 18 mins 53 secs)

Appendix A Scenario 3 PDF (PDF)

  • Size: 7.55 MB
  • Estimated download time: (56k = 18 mins 51 secs)

Appendix A Model Flood Cell PDF (PDF)

  • Size: 6.72 MB
  • Estimated download time: (56k = 16 mins 48 secs)

Appendix A Data Extraction PDF (PDF)

  • Size: 7.15 MB
  • Estimated download time: (56k = 17 mins 53 secs)

Increase Flood Level 1 in 20 Year (2107) Scenario 1 PDF (PDF)

  • Size: 6.78 MB
  • Estimated download time: (56k = 16 mins 56 secs)

Increase Flood Level 1 in 20 Year (2107) Scenario 2 PDF (PDF)

  • Size: 6.72 MB
  • Estimated download time: (56k = 16 mins 47 secs)

Increases in flood level 1 in 200 year (2107) Scenario 1 PDF (PDF)

  • Size: 6.76 MB
  • Estimated download time: (56k = 16 mins 54 secs)

Increases in flood level 1 in 200 year (2107) Scenario 2 PDF (PDF)

  • Size: 6.81 MB
  • Estimated download time: (56k = 17 mins 2 secs)

Increases in flood level 1 in 1000 year (2107) Scenario 1 PDF (PDF)

  • Size: 6.78 MB
  • Estimated download time: (56k = 16 mins 56 secs)

Increases in flood level 1 in 1000 year (2107) Scenario 2 PDF (PDF)

  • Size: 6.76 MB
  • Estimated download time: (56k = 16 mins 53 secs)

13 Increases in flood level 1 in 20 year (2107) Scenario 3 PDF (PDF)

  • Size: 6.8 MB
  • Estimated download time: (56k = 16 mins 59 secs)

Increases in flood level 1 in 200 year (2107) Scenario 3 PDF (PDF)

  • Size: 6.8 MB
  • Estimated download time: (56k = 16 mins 59 secs)

Increases in flood level 1 in 1000 year (2107) Scenario 3 PDF (PDF)

  • Size: 6.8 MB
  • Estimated download time: (56k = 16 mins 59 secs)

Appendix C 1 in 20 year (2107) Existing PDF (PDF)

  • Size: 7.55 MB
  • Estimated download time: (56k = 18 mins 51 secs)

Appendix C 1 in 20 year (2107) Scenario 1 PDF (PDF)

  • Size: 7.56 MB
  • Estimated download time: (56k = 18 mins 53 secs)

Appendix C 1 in 20 year (2107) Scenario 2 PDF (PDF)

  • Size: 7.57 MB
  • Estimated download time: (56k = 18 mins 54 secs)

Appendix C 1 in 200 year (2107) Existing PDF (PDF)

  • Size: 7.4 MB
  • Estimated download time: (56k = 18 mins 30 secs)

Appendix C 1 in 200 year (2107) Existing PDF (PDF)

  • Size: 7.4 MB
  • Estimated download time: (56k = 18 mins 30 secs)

Appendix C 1 in 200 year (2107) Scenario 1 PDF (PDF)

  • Size: 7.42 MB
  • Estimated download time: (56k = 18 mins 32 secs)

Appendix C 1 in 200 year (2107) Scenario 2 PDF (PDF)

  • Size: 7.48 MB
  • Estimated download time: (56k = 18 mins 42 secs)

Appendix C 1 in 1000 year (2107) Existing PDF (PDF)

  • Size: 7.32 MB
  • Estimated download time: (56k = 18 mins 17 secs)

Appendix C 1 in 1000 year (2107) Scenario 1 PDF (PDF)

  • Size: 7.33 MB
  • Estimated download time: (56k = 18 mins 18 secs)

Appendix C 1 in 1000 year (2107) Scenario 2 PDF (PDF)

  • Size: 7.34 MB
  • Estimated download time: (56k = 18 mins 20 secs)

Appendix C 1 in 20 year (2107) Scenario 3 PDF (PDF)

  • Size: 7.59 MB
  • Estimated download time: (56k = 18 mins 57 secs)

Appendix C 1 in 200 year (2107) Scenario 3 PDF (PDF)

  • Size: 7.48 MB
  • Estimated download time: (56k = 18 mins 41 secs)

Appendix C 1 in 1000 year (2107) Scenario 3 PDF (PDF)

  • Size: 7.34 MB
  • Estimated download time: (56k = 18 mins 20 secs)

Appendix D Flooding Hydrographs PDF (PDF)

  • Size: 553.18 KB
  • Estimated download time: (56k = 1 mins 21 secs)

Housing Market Assessment

The Housing Market Assessment is a project designed to piece together the housing situation in our area. The assessment is designed to assist the Council in drawing up LDF and housing policies.

The Policy Context PDF (PDF)

  • Size: 6.73 MB
  • Estimated download time: (56k = 16 mins 48 secs)

The Housing Situation and Housing Markets in the Sub-region PDF (PDF)

  • Size: 10.41 MB
  • Estimated download time: (56k = 26 mins 2 secs)

Lothingland Profile PDF (PDF)

  • Size: 6.78 MB
  • Estimated download time: (56k = 16 mins 56 secs)

Lowestoft North Profile PDF (PDF)

  • Size: 8.03 MB
  • Estimated download time: (56k = 20 mins 3 secs)

Lowestoft South Profile PDF (PDF)

  • Size: 7.61 MB
  • Estimated download time: (56k = 19 mins 0 secs)

Kessingland Profile PDF (PDF)

  • Size: 5.49 MB
  • Estimated download time: (56k = 13 mins 44 secs)

Waveney Rural Profile PDF (PDF)

  • Size: 6.04 MB
  • Estimated download time: (56k = 15 mins 5 secs)

Beccles Profile PDF (PDF)

  • Size: 6.66 MB
  • Estimated download time: (56k = 16 mins 39 secs)

Bungay Profile PDF (PDF)

  • Size: 5.88 MB
  • Estimated download time: (56k = 14 mins 41 secs)

Halesworth Profile PDF (PDF)

  • Size: 5.6 MB
  • Estimated download time: (56k = 13 mins 59 secs)

Southwold and Reydon Profile PDF (PDF)

  • Size: 5.77 MB
  • Estimated download time: (56k = 14 mins 26 secs)

Project 3 Housing Needs Assessment PDF (PDF)

  • Size: 8.61 MB
  • Estimated download time: (56k = 21 mins 30 secs)

Older People and Housing Options PDF (PDF)

  • Size: 3.6 MB
  • Estimated download time: (56k = 9 mins 0 secs)

Intermediate Market Housing PDF (PDF)

  • Size: 3.97 MB
  • Estimated download time: (56k = 9 mins 56 secs)

Housing Needs of Hostel Residents PDF (PDF)

  • Size: 3.67 MB
  • Estimated download time: (56k = 9 mins 11 secs)

Housing Issues for Black and Minority Ethnic Residents PDF (PDF)

  • Size: 3.13 MB
  • Estimated download time: (56k = 7 mins 50 secs)

Accommodation Needs for Gypsies and Travellers PDF (PDF)

  • Size: 3.23 MB
  • Estimated download time: (56k = 8 mins 5 secs)

Executive Summary for the Sub-Region PDF (PDF)

  • Size: 1.13 MB
  • Estimated download time: (56k = 2 mins 50 secs)

Key Conculstions and Recommendations - Waveney District PDF (PDF)

  • Size: 2.46 MB
  • Estimated download time: (56k = 6 mins 9 secs)

Updating the Assessment PDF (PDF)

  • Size: 3.31 MB
  • Estimated download time: (56k = 8 mins 17 secs)

Open Space Needs Assessment

The Open Space Needs Assessment provides information about existing community needs and aspirations in relation to parks and green spaces, plus a set of local standards.

Main Document PDF (PDF)

  • Size: 1.89 MB
  • Estimated download time: (56k = 4 mins 44 secs)

Appendices PDF (PDF)

  • Size: 235.1 KB
  • Estimated download time: (56k = 35 secs)

Maps Part 1 PDF (PDF)

  • Size: 6.24 MB
  • Estimated download time: (56k = 15 mins 35 secs)

Maps Part 2 PDF (PDF)

  • Size: 8.56 MB
  • Estimated download time: (56k = 21 mins 23 secs)

Retail and Leisure Study

This study assesses the vitality and viability of the main shopping areas in Waveney and Great Yarmouth. It provides an indication of the likely future capacity and demand for additional floorspace.

Summary PDF (PDF)

  • Size: 223.84 KB
  • Estimated download time: (56k = 33 secs)

Main document PDF (PDF)

  • Size: 4.99 MB
  • Estimated download time: (56k = 12 mins 29 secs)

Appendices PDF (PDF)

  • Size: 2.48 MB
  • Estimated download time: (56k = 6 mins 14 secs)

Household survey PDF (PDF)

  • Size: 616.62 KB
  • Estimated download time: (56k = 1 mins 32 secs)

Opportunity sites PDF (PDF)

  • Size: 1.06 MB
  • Estimated download time: (56k = 2 mins 39 secs)

Strategic Flood Risk Assessment

The purpose of the Strategic Flood Risk Assessment (SFRA) is to enable a more detailed understand of flood risk and identify areas vulnerable to flooding.

Main document PDF (PDF)

  • Size: 6.05 MB
  • Estimated download time: (56k = 15 mins 8 secs)

Appendices PDF (PDF)

  • Size: 262.39 KB
  • Estimated download time: (56k = 39 secs)

Depth and Hazard Modelling - Lowestoft Scenarios (assumes existing defence heights) PDF (PDF)

  • Size: 9 MB
  • Estimated download time: (56k = 22 mins 29 secs)

Depth and Hazard Modelling - Southwold and Reydon Scenarios PDF (PDF)

  • Size: 8.3 MB
  • Estimated download time: (56k = 20 mins 44 secs)

Figures A1-A4 PDF (PDF)

  • Size: 4.74 MB
  • Estimated download time: (56k = 11 mins 50 secs)

PPS25 Flood Zones - Barnby and North Cove, Beccles, Blundeston, Bungay, PDF (PDF)

  • Size: 3.38 MB
  • Estimated download time: (56k = 8 mins 26 secs)

PPS25 Flood Zones - Lowestoft PDF (PDF)

  • Size: 808.31 KB
  • Estimated download time: (56k = 1 mins 59 secs)

Depth and Hazard Modelling - Lowestoft Scenarios (assumes theoretical improved defences) (Part 1) PDF (PDF)

  • Size: 8.52 MB
  • Estimated download time: (56k = 21 mins 17 secs)

Depth and Hazard Modelling - Lowestoft Scenarios (assumes theoretical improved defences) (Part 2) PDF (PDF)

  • Size: 5.14 MB
  • Estimated download time: (56k = 12 mins 50 secs)

PPS25 Flood Zones Southwold and Reydon PDF (PDF)

  • Size: 687.26 KB
  • Estimated download time: (56k = 1 mins 41 secs)

River Waveney Climate Change Modelling PDF (PDF)

  • Size: 3.34 MB
  • Estimated download time: (56k = 8 mins 20 secs)

PPS25 Flood Zones - Waveney (Part 1) PDF (PDF)

  • Size: 7.35 MB
  • Estimated download time: (56k = 18 mins 23 secs)

PPS25 Flood Zones - Waveney (Part 2) PDF (PDF)

  • Size: 7.01 MB
  • Estimated download time: (56k = 17 mins 30 secs)

Affordable Housing Viability Study

A study of the economic viability of affordable housing provision.

Viability Study PDF (PDF)

  • Size: 3.1 MB
  • Estimated download time: (56k = 7 mins 45 secs)

Allotments, Cemeteries and Churchyards Needs Assessment: Supplement to the Open Space Needs Assessment

This needs assessment covers quantity, quality and accessibility of sites, and provides recommendations on standards and provision.

Main document PDF (PDF)

  • Size: 656.85 KB
  • Estimated download time: (56k = 1 mins 38 secs)

Beccles area map PDF (PDF)

  • Size: 2.14 MB
  • Estimated download time: (56k = 5 mins 23 secs)

Bungay area map PDF (PDF)

  • Size: 1013.96 KB
  • Estimated download time: (56k = 2 mins 29 secs)

Halesworth area map PDF (PDF)

  • Size: 1.85 MB
  • Estimated download time: (56k = 4 mins 38 secs)

Kessingland area map PDF (PDF)

  • Size: 1.71 MB
  • Estimated download time: (56k = 4 mins 17 secs)

North Lowestoft area map PDF (PDF)

  • Size: 2.39 MB
  • Estimated download time: (56k = 5 mins 59 secs)

South Lowestoft area map PDF (PDF)

  • Size: 2.28 MB
  • Estimated download time: (56k = 5 mins 42 secs)

Southwold Area Map PDF (PDF)

  • Size: 1.46 MB
  • Estimated download time: (56k = 3 mins 39 secs)

District map PDF (PDF)

  • Size: 423.81 KB
  • Estimated download time: (56k = 1 mins 2 secs)

Contamination reports

Information on the presence or otherwise of ground gases, in advance of potential change of use and development of the two sites.

Monckton Avenue Nursery, Lowestoft PDF (PDF)

  • Size: 6.03 MB
  • Estimated download time: (56k = 15 mins 3 secs)

Neeves Pit, Lowestoft PDF (PDF)

  • Size: 5.96 MB
  • Estimated download time: (56k = 14 mins 53 secs)

Ecological Assessment of Proposed Development Sites

Information on the wildlife interest of each site, highlighting the presence of habitats & protected species and ranking the ecological value of the sites to wildlife & identifying links.

Ecological Assessment PDF (PDF)

  • Size: 2.17 MB
  • Estimated download time: (56k = 5 mins 26 secs)

Employment Land Study

Assessing future employment land needs for Great Yarmouth Borough Council and Waveney District Council, and employment land policy for the sub region as a whole.

View the study PDF (PDF)

  • Size: 4.89 MB
  • Estimated download time: (56k = 12 mins 14 secs)

Halesworth Town Centre: Retail Needs and Opportunity Sites Assessment

This study provides the baseline evidence to inform the Site Specific Allocations document. It also provides the evidence base to help determine retail planning applications in Halesworth.

Sites assessment PDF (PDF)

  • Size: 4.22 MB
  • Estimated download time: (56k = 10 mins 32 secs)

Landscape Character Assessment

The purpose of landscape character assessment is to help ensure that change and development does not undermine whatever is characteristic or valued about a particular place.

Part 1 PDF (PDF)

  • Size: 10.8 MB
  • Estimated download time: (56k = 26 mins 59 secs)

Part 2 PDF (PDF)

  • Size: 11.49 MB
  • Estimated download time: (56k = 28 mins 41 secs)

Pitch and Non-Pitch Assessment

Assessing the supply of, and demand for, pitch and non-pitch sports provision in Waveney.

View the assessment PDF (PDF)

  • Size: 327.27 KB
  • Estimated download time: (56k = 48 secs)

Sites Viability Study

An assessment of site viability based on the main costs of developing the sites, such as building costs, demolition, land remediation, access, highway improvements and financial contributions.

Part 1 - Lowestoft PDF (PDF)

  • Size: 2.72 MB
  • Estimated download time: (56k = 6 mins 47 secs)

Part 2 - Beccles, Bungay, Halesworth & Reydon PDF (PDF)

  • Size: 5.72 MB
  • Estimated download time: (56k = 14 mins 17 secs)

Strategic Housing Land Availability Assessment

This assessment is integral to the identification and allocation of land required to meet housing needs, identifying sites with potential for housing and assessing when they're likely to be developed.

Strategic Housing Land Availability Assessment 2012 (Final) (SHLAA) PDF (PDF)

  • Size: 299.07 KB
  • Estimated download time: (56k = 44 secs)

Strategic Housing Land Availability Assessment Appendices 2012 (Final) PDF (PDF)

  • Size: 5.67 MB
  • Estimated download time: (56k = 14 mins 9 secs)

Draft Strategic Housing Land Availability Assessment 2012 PDF (PDF)

  • Size: 298.64 KB
  • Estimated download time: (56k = 44 secs)

Draft Strategic Housing Land Availability Assessment 2012 Appendices PDF (PDF)

  • Size: 5.56 MB
  • Estimated download time: (56k = 13 mins 54 secs)

Strategic Housing Land Availability Assessment 2007 PDF (PDF)

  • Size: 5.19 MB
  • Estimated download time: (56k = 12 mins 59 secs)

Suffolk Cross-Boundary Gypsy and Traveller Accommodation Assessment

Ensuring that members of the gypsy and traveller communities have equal access to decent and appropriate accommodation options akin every other member of society.

View the assessment PDF (PDF)

  • Size: 689.54 KB
  • Estimated download time: (56k = 1 mins 41 secs)

Water Cycle Strategy

Ensuring development is constructed in a sustainable manner with respect to water environment and water infrastructure.

Scoping study PDF (PDF)

  • Size: 2.93 MB
  • Estimated download time: (56k = 7 mins 20 secs)

Waveney Renewable Energy and Sustainable Construction Study

Informing sustainable construction & renewable energy policies to ensure that core strategy objectives can be delivered in a sustainable, carbon efficient way.

View the study PDF (PDF)

  • Size: 5.64 MB
  • Estimated download time: (56k = 14 mins 6 secs)

Waveney's Future - Waveney Sustainable Communities Strategy 2010-2028

Setting out a 20-year vision of Waveney and representing the long-term strategic plans for the area.

Sustainable communities strategy PDF (PDF)

  • Size: 2.05 MB
  • Estimated download time: (56k = 5 mins 8 secs)

Notes on Implementation

Planning guidance is produced to complement Local Plan policies and proposals. It is used to help implement the policies and proposals, for example a development brief for a specific housing site.

DTZ Employment Land Evidence Base Report

This report presents the employment land evidence base underpinning the Lowestoft and Great Yarmouth Area Action Plans (AAPs).

Evidence base report PDF (PDF)

  • Size: 446.85 KB
  • Estimated download time: (56k = 1 mins 6 secs)

PowerPark Demand and Need Report

This document explains the background and vision for the PowerPark, as featured in the Lake Lothing and Outer Harbour Area Action Plan.

View the report PDF (PDF)

  • Size: 1.97 MB
  • Estimated download time: (56k = 4 mins 56 secs)

Sub-Regional Housing Strategy

This strategy sets out the main housing issues that affect the Great Yarmouth and Waveney sub-region, and identifies areas where we can add value by acting together.

View the strategy PDF (PDF)

  • Size: 837.88 KB
  • Estimated download time: (56k = 2 mins 3 secs)

Waveney Sunrise Coast Tourism Strategy

Setting the agenda for developing tourism in a sustainable way to ensure we are meeting the needs of today's visitor without damaging the needs of our future generations.

Tourism strategy PDF (PDF)

  • Size: 1.48 MB
  • Estimated download time: (56k = 3 mins 41 secs)

Waveney Open Space Strategy

This strategy will help shape the management, maintenance and planning of open space in Waveney for the next 10 to 15 years.

View the strategy PDF (PDF)

  • Size: 228.64 KB
  • Estimated download time: (56k = 34 secs)

Lowestoft Design Guide

This design guide aims to improve and reinforce the identity of the town by promoting good urban design and developing a robust palette of materials, from surfacing and signage to bollards and benches

Part 1 PDF (PDF)

  • Size: 8.98 MB
  • Estimated download time: (56k = 22 mins 26 secs)

Part 2 PDF (PDF)

  • Size: 8.25 MB
  • Estimated download time: (56k = 20 mins 36 secs)

Suffolk Rail Strategy

This document outlines a strategy for development of passenger rail services serving Suffolk, also including freight traffic carried by rail.

Rail strategy PDF (PDF)

  • Size: 2.83 MB
  • Estimated download time: (56k = 7 mins 5 secs)

Technical note - Lowestoft Highway Scheme Option Testing

This details the assessment work undertaken of the Lowestoft 1st East development proposals and the proposed new crossing of Lake Lothing.

Technical note PDF (PDF)

  • Size: 10.99 MB
  • Estimated download time: (56k = 27 mins 26 secs)

A12 Lowestoft Study Lake Lothing Third Crossing Feasibility Study

Preliminary work to help to determine whether a third river crossing and allied infrastructure identified in the Lowestoft Infrastructure Review have the potential to be progressed.

Main document PDF (PDF)

  • Size: 3.75 MB
  • Estimated download time: (56k = 9 mins 23 secs)

Appendix A PDF (PDF)

  • Size: 8 MB
  • Estimated download time: (56k = 19 mins 59 secs)

Appendix B (part 1) PDF (PDF)

  • Size: 6.88 MB
  • Estimated download time: (56k = 17 mins 11 secs)

Appendix B (part 2) PDF (PDF)

  • Size: 8.25 MB
  • Estimated download time: (56k = 20 mins 36 secs)

Lowestoft ground conditions study

The study aims to identify the ground conditions that may exist at the site of the URC redevelopment along the corridor of Lake Lothing and environs.

Baseline report PDF (PDF)

  • Size: 279.16 KB
  • Estimated download time: (56k = 41 secs)

Baseline Report

This study informs and underlies the Area Action Plan for central Lowestoft. Baseline information will continue to be collected throughout the project and will be fed into the ongoing Masterplan work.

Parts 1 to 15 PDF (PDF)

  • Size: 5.01 MB
  • Estimated download time: (56k = 12 mins 32 secs)

Part 16 PDF (PDF)

  • Size: 8.34 MB
  • Estimated download time: (56k = 20 mins 50 secs)

Part 17 PDF (PDF)

  • Size: 7.81 MB
  • Estimated download time: (56k = 19 mins 30 secs)

Part 18 PDF (PDF)

  • Size: 9.76 MB
  • Estimated download time: (56k = 24 mins 23 secs)

Parts 19 to 21 PDF (PDF)

  • Size: 7.78 MB
  • Estimated download time: (56k = 19 mins 26 secs)

Parts 22 to 23 PDF (PDF)

  • Size: 10.95 MB
  • Estimated download time: (56k = 27 mins 21 secs)

Parts 24 to 32 PDF (PDF)

  • Size: 11.34 MB
  • Estimated download time: (56k = 28 mins 20 secs)

Parts 33 to 37 PDF (PDF)

  • Size: 5.95 MB
  • Estimated download time: (56k = 14 mins 53 secs)

Parts 38 to 42 PDF (PDF)

  • Size: 10.13 MB
  • Estimated download time: (56k = 25 mins 18 secs)

Parts 43 to 60 PDF (PDF)

  • Size: 2.65 MB
  • Estimated download time: (56k = 6 mins 38 secs)

Parts 61 to 68 PDF (PDF)

  • Size: 8.59 MB
  • Estimated download time: (56k = 21 mins 27 secs)

Parts 69 to 90 PDF (PDF)

  • Size: 7.46 MB
  • Estimated download time: (56k = 18 mins 38 secs)

Property Market Baseline Report

Describing the national and local market trends in each of the major sectors of the property market, i.e. offices, industrial and distribution, retail, leisure and residential property.

Baseline report PDF (PDF)

  • Size: 262.97 KB
  • Estimated download time: (56k = 39 secs)

Advising on the Potential for Small-Scale Renewable Energy Generation within the URC Area

Providing a baseline assessment of mature small-scale alternative energy generation potential and key enabling actions to support this development in central Lowestoft.

View the document PDF (PDF)

  • Size: 996.99 KB
  • Estimated download time: (56k = 2 mins 26 secs)

Outline inspection of quay walls at Lowestoft

An overview of quay walls within the area designated for regeneration in Lowestoft as part of a baseline analysis to support the development of the URC master plan for Great Yarmouth and Lowestoft.

View the document PDF (PDF)

  • Size: 660.35 KB
  • Estimated download time: (56k = 1 mins 38 secs)

Translating known market prospects into spatial requirements and implications for ports Infrastructure

Offshore wind / renewable energy report.

View the document PDF (PDF)

  • Size: 806.01 KB
  • Estimated download time: (56k = 1 mins 59 secs)

Strategic Framework

This report describes the sub-regional and townscape context of the central Lowestoft Area Action Plan, and sets out strategic and local challenges to guide future development of the Masterplan.

View the framework PDF (PDF)

  • Size: 11.73 MB
  • Estimated download time: (56k = 29 mins 18 secs)

Draft Sustainability Appraisal Scoping Report - August 2006

A Sustainability Appraisal Scoping Report was prepared jointly for the Development Management Policies and Site Specific Allocations.

Sustainability Appraisal Scoping Report PDF (PDF)

  • Size: 1.04 MB
  • Estimated download time: (56k = 2 mins 36 secs)

Responses and Amendments to the Draft Sustainability Appraisal Scoping Report following consultation PDF (PDF)

  • Size: 123.28 KB
  • Estimated download time: (56k = 19 secs)

Strategic Framework

This report describes the sub-regional and townscape context of the URC area, and sets out a number of strategic and local challenges to guide future development of the Masterplan.

Part 1 PDF (PDF)

  • Size: 7.21 MB
  • Estimated download time: (56k = 18 mins 2 secs)

Part 2 PDF (PDF)

  • Size: 4.62 MB
  • Estimated download time: (56k = 11 mins 32 secs)

Gosford Road, Beccles Revised Development Brief

This development brief helps to guide development on land adjacent to the former Beccles Maltings at Gosford Road, Beccles.

View the Development Brief (Supplementary Planning Guidance No. 7) PDF (PDF)

  • Size: 4.94 MB
  • Estimated download time: (56k = 12 mins 21 secs)

Examiner's Report on the Waveney Community Infrastructure Levy

Examiner's Report on the Waveney Community Infrastructure Levy

Examiner's Report PDF (PDF)

  • Size: 135.4 KB
  • Estimated download time: (56k = 20 secs)

Contact us

Telephone: 01502 562111

Send your feedback or find key contact details.