Downloads: Planning policy
The following documents are available for download. Documents in PDF format can be read using Adobe Reader.
MS Word and Powerpoint documents can be read by using their respective applications or any alternatives.
Available downloads
Housing factsheets
This factsheet provides information on housing completions within Waveney.
Factsheet 2011/12
(PDF)
- Size: 58.34 KB
- Estimated download time: (56k = 9 secs)
Factsheet 2010/11
(PDF)
- Size: 52.36 KB
- Estimated download time: (56k = 8 secs)
Factsheet 2009/10
(PDF)
- Size: 109.68 KB
- Estimated download time: (56k = 17 secs)
Factsheet 2008/9
(PDF)
- Size: 42.18 KB
- Estimated download time: (56k = 7 secs)
Factsheet 2007/8
(PDF)
- Size: 41.52 KB
- Estimated download time: (56k = 7 secs)
Factsheet 2006/7
(PDF)
- Size: 39.75 KB
- Estimated download time: (56k = 6 secs)
Biodiversity audits
An audit by Suffolk Wildlife Trust was undertaken on biodiversity in the towns and Kessingland.
Beccles
(PDF)
- Size: 5.86 MB
- Estimated download time: (56k = 14 mins 38 secs)
Bungay
(PDF)
- Size: 4.92 MB
- Estimated download time: (56k = 12 mins 18 secs)
Halesworth
(PDF)
- Size: 5.91 MB
- Estimated download time: (56k = 14 mins 47 secs)
Kessingland
(PDF)
- Size: 3.4 MB
- Estimated download time: (56k = 8 mins 30 secs)
Lowestoft Part 1
(PDF)
- Size: 10.36 MB
- Estimated download time: (56k = 25 mins 53 secs)
Lowestoft Part 2
(PDF)
- Size: 11.52 MB
- Estimated download time: (56k = 28 mins 47 secs)
Southwold and Reydon
(PDF)
- Size: 4.64 MB
- Estimated download time: (56k = 11 mins 35 secs)
Cumulative Land Raising Study
An analysis of potential impacts on the tidal flood cell of Lake Lothing, Lowestoft as a result of proposed land raising scenarios for several regeneration sites.
Main Document
(PDF)
- Size: 1.31 MB
- Estimated download time: (56k = 3 mins 17 secs)
Appendix A Scenario 1
(PDF)
- Size: 7.52 MB
- Estimated download time: (56k = 18 mins 47 secs)
Appendix A Scenario 2
(PDF)
- Size: 7.55 MB
- Estimated download time: (56k = 18 mins 53 secs)
Appendix A Scenario 3
(PDF)
- Size: 7.55 MB
- Estimated download time: (56k = 18 mins 51 secs)
Appendix A Model Flood Cell
(PDF)
- Size: 6.72 MB
- Estimated download time: (56k = 16 mins 48 secs)
Appendix A Data Extraction
(PDF)
- Size: 7.15 MB
- Estimated download time: (56k = 17 mins 53 secs)
Increase Flood Level 1 in 20 Year (2107) Scenario 1
(PDF)
- Size: 6.78 MB
- Estimated download time: (56k = 16 mins 56 secs)
Increase Flood Level 1 in 20 Year (2107) Scenario 2
(PDF)
- Size: 6.72 MB
- Estimated download time: (56k = 16 mins 47 secs)
Increases in flood level 1 in 200 year (2107) Scenario 1
(PDF)
- Size: 6.76 MB
- Estimated download time: (56k = 16 mins 54 secs)
Increases in flood level 1 in 200 year (2107) Scenario 2
(PDF)
- Size: 6.81 MB
- Estimated download time: (56k = 17 mins 2 secs)
Increases in flood level 1 in 1000 year (2107) Scenario 1
(PDF)
- Size: 6.78 MB
- Estimated download time: (56k = 16 mins 56 secs)
Increases in flood level 1 in 1000 year (2107) Scenario 2
(PDF)
- Size: 6.76 MB
- Estimated download time: (56k = 16 mins 53 secs)
13 Increases in flood level 1 in 20 year (2107) Scenario 3
(PDF)
- Size: 6.8 MB
- Estimated download time: (56k = 16 mins 59 secs)
Increases in flood level 1 in 200 year (2107) Scenario 3
(PDF)
- Size: 6.8 MB
- Estimated download time: (56k = 16 mins 59 secs)
Increases in flood level 1 in 1000 year (2107) Scenario 3
(PDF)
- Size: 6.8 MB
- Estimated download time: (56k = 16 mins 59 secs)
Appendix C 1 in 20 year (2107) Existing
(PDF)
- Size: 7.55 MB
- Estimated download time: (56k = 18 mins 51 secs)
Appendix C 1 in 20 year (2107) Scenario 1
(PDF)
- Size: 7.56 MB
- Estimated download time: (56k = 18 mins 53 secs)
Appendix C 1 in 20 year (2107) Scenario 2
(PDF)
- Size: 7.57 MB
- Estimated download time: (56k = 18 mins 54 secs)
Appendix C 1 in 200 year (2107) Existing
(PDF)
- Size: 7.4 MB
- Estimated download time: (56k = 18 mins 30 secs)
Appendix C 1 in 200 year (2107) Existing
(PDF)
- Size: 7.4 MB
- Estimated download time: (56k = 18 mins 30 secs)
Appendix C 1 in 200 year (2107) Scenario 1
(PDF)
- Size: 7.42 MB
- Estimated download time: (56k = 18 mins 32 secs)
Appendix C 1 in 200 year (2107) Scenario 2
(PDF)
- Size: 7.48 MB
- Estimated download time: (56k = 18 mins 42 secs)
Appendix C 1 in 1000 year (2107) Existing
(PDF)
- Size: 7.32 MB
- Estimated download time: (56k = 18 mins 17 secs)
Appendix C 1 in 1000 year (2107) Scenario 1
(PDF)
- Size: 7.33 MB
- Estimated download time: (56k = 18 mins 18 secs)
Appendix C 1 in 1000 year (2107) Scenario 2
(PDF)
- Size: 7.34 MB
- Estimated download time: (56k = 18 mins 20 secs)
Appendix C 1 in 20 year (2107) Scenario 3
(PDF)
- Size: 7.59 MB
- Estimated download time: (56k = 18 mins 57 secs)
Appendix C 1 in 200 year (2107) Scenario 3
(PDF)
- Size: 7.48 MB
- Estimated download time: (56k = 18 mins 41 secs)
Appendix C 1 in 1000 year (2107) Scenario 3
(PDF)
- Size: 7.34 MB
- Estimated download time: (56k = 18 mins 20 secs)
Appendix D Flooding Hydrographs
(PDF)
- Size: 553.18 KB
- Estimated download time: (56k = 1 mins 21 secs)
Housing Market Assessment
The Housing Market Assessment is a project designed to piece together the housing situation in our area. The assessment is designed to assist the Council in drawing up LDF and housing policies.
The Policy Context
(PDF)
- Size: 6.73 MB
- Estimated download time: (56k = 16 mins 48 secs)
The Housing Situation and Housing Markets in the Sub-region
(PDF)
- Size: 10.41 MB
- Estimated download time: (56k = 26 mins 2 secs)
Lothingland Profile
(PDF)
- Size: 6.78 MB
- Estimated download time: (56k = 16 mins 56 secs)
Lowestoft North Profile
(PDF)
- Size: 8.03 MB
- Estimated download time: (56k = 20 mins 3 secs)
Lowestoft South Profile
(PDF)
- Size: 7.61 MB
- Estimated download time: (56k = 19 mins 0 secs)
Kessingland Profile
(PDF)
- Size: 5.49 MB
- Estimated download time: (56k = 13 mins 44 secs)
Waveney Rural Profile
(PDF)
- Size: 6.04 MB
- Estimated download time: (56k = 15 mins 5 secs)
Beccles Profile
(PDF)
- Size: 6.66 MB
- Estimated download time: (56k = 16 mins 39 secs)
Bungay Profile
(PDF)
- Size: 5.88 MB
- Estimated download time: (56k = 14 mins 41 secs)
Halesworth Profile
(PDF)
- Size: 5.6 MB
- Estimated download time: (56k = 13 mins 59 secs)
Southwold and Reydon Profile
(PDF)
- Size: 5.77 MB
- Estimated download time: (56k = 14 mins 26 secs)
Project 3 Housing Needs Assessment
(PDF)
- Size: 8.61 MB
- Estimated download time: (56k = 21 mins 30 secs)
Older People and Housing Options
(PDF)
- Size: 3.6 MB
- Estimated download time: (56k = 9 mins 0 secs)
Intermediate Market Housing
(PDF)
- Size: 3.97 MB
- Estimated download time: (56k = 9 mins 56 secs)
Housing Needs of Hostel Residents
(PDF)
- Size: 3.67 MB
- Estimated download time: (56k = 9 mins 11 secs)
Housing Issues for Black and Minority Ethnic Residents
(PDF)
- Size: 3.13 MB
- Estimated download time: (56k = 7 mins 50 secs)
Accommodation Needs for Gypsies and Travellers
(PDF)
- Size: 3.23 MB
- Estimated download time: (56k = 8 mins 5 secs)
Executive Summary for the Sub-Region
(PDF)
- Size: 1.13 MB
- Estimated download time: (56k = 2 mins 50 secs)
Key Conculstions and Recommendations - Waveney District
(PDF)
- Size: 2.46 MB
- Estimated download time: (56k = 6 mins 9 secs)
Updating the Assessment
(PDF)
- Size: 3.31 MB
- Estimated download time: (56k = 8 mins 17 secs)
Open Space Needs Assessment
The Open Space Needs Assessment provides information about existing community needs and aspirations in relation to parks and green spaces, plus a set of local standards.
Main Document
(PDF)
- Size: 1.89 MB
- Estimated download time: (56k = 4 mins 44 secs)
Appendices
(PDF)
- Size: 235.1 KB
- Estimated download time: (56k = 35 secs)
Maps Part 1
(PDF)
- Size: 6.24 MB
- Estimated download time: (56k = 15 mins 35 secs)
Maps Part 2
(PDF)
- Size: 8.56 MB
- Estimated download time: (56k = 21 mins 23 secs)
Retail and Leisure Study
This study assesses the vitality and viability of the main shopping areas in Waveney and Great Yarmouth. It provides an indication of the likely future capacity and demand for additional floorspace.
Summary
(PDF)
- Size: 223.84 KB
- Estimated download time: (56k = 33 secs)
Main document
(PDF)
- Size: 4.99 MB
- Estimated download time: (56k = 12 mins 29 secs)
Appendices
(PDF)
- Size: 2.48 MB
- Estimated download time: (56k = 6 mins 14 secs)
Household survey
(PDF)
- Size: 616.62 KB
- Estimated download time: (56k = 1 mins 32 secs)
Opportunity sites
(PDF)
- Size: 1.06 MB
- Estimated download time: (56k = 2 mins 39 secs)
Strategic Flood Risk Assessment
The purpose of the Strategic Flood Risk Assessment (SFRA) is to enable a more detailed understand of flood risk and identify areas vulnerable to flooding.
Main document
(PDF)
- Size: 6.05 MB
- Estimated download time: (56k = 15 mins 8 secs)
Appendices
(PDF)
- Size: 262.39 KB
- Estimated download time: (56k = 39 secs)
Depth and Hazard Modelling - Lowestoft Scenarios (assumes existing defence heights)
(PDF)
- Size: 9 MB
- Estimated download time: (56k = 22 mins 29 secs)
Depth and Hazard Modelling - Southwold and Reydon Scenarios
(PDF)
- Size: 8.3 MB
- Estimated download time: (56k = 20 mins 44 secs)
Figures A1-A4
(PDF)
- Size: 4.74 MB
- Estimated download time: (56k = 11 mins 50 secs)
PPS25 Flood Zones - Barnby and North Cove, Beccles, Blundeston, Bungay,
(PDF)
- Size: 3.38 MB
- Estimated download time: (56k = 8 mins 26 secs)
PPS25 Flood Zones - Lowestoft
(PDF)
- Size: 808.31 KB
- Estimated download time: (56k = 1 mins 59 secs)
Depth and Hazard Modelling - Lowestoft Scenarios (assumes theoretical improved defences) (Part 1)
(PDF)
- Size: 8.52 MB
- Estimated download time: (56k = 21 mins 17 secs)
Depth and Hazard Modelling - Lowestoft Scenarios (assumes theoretical improved defences) (Part 2)
(PDF)
- Size: 5.14 MB
- Estimated download time: (56k = 12 mins 50 secs)
PPS25 Flood Zones Southwold and Reydon
(PDF)
- Size: 687.26 KB
- Estimated download time: (56k = 1 mins 41 secs)
River Waveney Climate Change Modelling
(PDF)
- Size: 3.34 MB
- Estimated download time: (56k = 8 mins 20 secs)
PPS25 Flood Zones - Waveney (Part 1)
(PDF)
- Size: 7.35 MB
- Estimated download time: (56k = 18 mins 23 secs)
PPS25 Flood Zones - Waveney (Part 2)
(PDF)
- Size: 7.01 MB
- Estimated download time: (56k = 17 mins 30 secs)
Affordable Housing Viability Study
A study of the economic viability of affordable housing provision.
Viability Study
(PDF)
- Size: 3.1 MB
- Estimated download time: (56k = 7 mins 45 secs)
Allotments, Cemeteries and Churchyards Needs Assessment: Supplement to the Open Space Needs Assessment
This needs assessment covers quantity, quality and accessibility of sites, and provides recommendations on standards and provision.
Main document
(PDF)
- Size: 656.85 KB
- Estimated download time: (56k = 1 mins 38 secs)
Beccles area map
(PDF)
- Size: 2.14 MB
- Estimated download time: (56k = 5 mins 23 secs)
Bungay area map
(PDF)
- Size: 1013.96 KB
- Estimated download time: (56k = 2 mins 29 secs)
Halesworth area map
(PDF)
- Size: 1.85 MB
- Estimated download time: (56k = 4 mins 38 secs)
Kessingland area map
(PDF)
- Size: 1.71 MB
- Estimated download time: (56k = 4 mins 17 secs)
North Lowestoft area map
(PDF)
- Size: 2.39 MB
- Estimated download time: (56k = 5 mins 59 secs)
South Lowestoft area map
(PDF)
- Size: 2.28 MB
- Estimated download time: (56k = 5 mins 42 secs)
Southwold Area Map
(PDF)
- Size: 1.46 MB
- Estimated download time: (56k = 3 mins 39 secs)
District map
(PDF)
- Size: 423.81 KB
- Estimated download time: (56k = 1 mins 2 secs)
Contamination reports
Information on the presence or otherwise of ground gases, in advance of potential change of use and development of the two sites.
Monckton Avenue Nursery, Lowestoft
(PDF)
- Size: 6.03 MB
- Estimated download time: (56k = 15 mins 3 secs)
Neeves Pit, Lowestoft
(PDF)
- Size: 5.96 MB
- Estimated download time: (56k = 14 mins 53 secs)
Ecological Assessment of Proposed Development Sites
Information on the wildlife interest of each site, highlighting the presence of habitats & protected species and ranking the ecological value of the sites to wildlife & identifying links.
Ecological Assessment
(PDF)
- Size: 2.17 MB
- Estimated download time: (56k = 5 mins 26 secs)
Employment Land Study
Assessing future employment land needs for Great Yarmouth Borough Council and Waveney District Council, and employment land policy for the sub region as a whole.
View the study
(PDF)
- Size: 4.89 MB
- Estimated download time: (56k = 12 mins 14 secs)
Halesworth Town Centre: Retail Needs and Opportunity Sites Assessment
This study provides the baseline evidence to inform the Site Specific Allocations document. It also provides the evidence base to help determine retail planning applications in Halesworth.
Sites assessment
(PDF)
- Size: 4.22 MB
- Estimated download time: (56k = 10 mins 32 secs)
Landscape Character Assessment
The purpose of landscape character assessment is to help ensure that change and development does not undermine whatever is characteristic or valued about a particular place.
Pitch and Non-Pitch Assessment
Assessing the supply of, and demand for, pitch and non-pitch sports provision in Waveney.
View the assessment
(PDF)
- Size: 327.27 KB
- Estimated download time: (56k = 48 secs)
Sites Viability Study
An assessment of site viability based on the main costs of developing the sites, such as building costs, demolition, land remediation, access, highway improvements and financial contributions.
Part 1 - Lowestoft
(PDF)
- Size: 2.72 MB
- Estimated download time: (56k = 6 mins 47 secs)
Part 2 - Beccles, Bungay, Halesworth & Reydon
(PDF)
- Size: 5.72 MB
- Estimated download time: (56k = 14 mins 17 secs)
Strategic Housing Land Availability Assessment
This assessment is integral to the identification and allocation of land required to meet housing needs, identifying sites with potential for housing and assessing when they're likely to be developed.
Strategic Housing Land Availability Assessment 2012 (Final) (SHLAA)
(PDF)
- Size: 299.07 KB
- Estimated download time: (56k = 44 secs)
Strategic Housing Land Availability Assessment Appendices 2012 (Final)
(PDF)
- Size: 5.67 MB
- Estimated download time: (56k = 14 mins 9 secs)
Draft Strategic Housing Land Availability Assessment 2012
(PDF)
- Size: 298.64 KB
- Estimated download time: (56k = 44 secs)
Draft Strategic Housing Land Availability Assessment 2012 Appendices
(PDF)
- Size: 5.56 MB
- Estimated download time: (56k = 13 mins 54 secs)
Strategic Housing Land Availability Assessment 2007
(PDF)
- Size: 5.19 MB
- Estimated download time: (56k = 12 mins 59 secs)
Suffolk Cross-Boundary Gypsy and Traveller Accommodation Assessment
Ensuring that members of the gypsy and traveller communities have equal access to decent and appropriate accommodation options akin every other member of society.
View the assessment
(PDF)
- Size: 689.54 KB
- Estimated download time: (56k = 1 mins 41 secs)
Water Cycle Strategy
Ensuring development is constructed in a sustainable manner with respect to water environment and water infrastructure.
Scoping study
(PDF)
- Size: 2.93 MB
- Estimated download time: (56k = 7 mins 20 secs)
Waveney Renewable Energy and Sustainable Construction Study
Informing sustainable construction & renewable energy policies to ensure that core strategy objectives can be delivered in a sustainable, carbon efficient way.
View the study
(PDF)
- Size: 5.64 MB
- Estimated download time: (56k = 14 mins 6 secs)
Waveney's Future - Waveney Sustainable Communities Strategy 2010-2028
Setting out a 20-year vision of Waveney and representing the long-term strategic plans for the area.
Sustainable communities strategy
(PDF)
- Size: 2.05 MB
- Estimated download time: (56k = 5 mins 8 secs)
Notes on Implementation
Planning guidance is produced to complement Local Plan policies and proposals. It is used to help implement the policies and proposals, for example a development brief for a specific housing site.
Affordable Housing - June 2005 (SUPERSEDED 23/05/2012 - please type 'affordable spd' into the search box above to find the latest guidance)
(PDF)
- Size: 768.51 KB
- Estimated download time: (56k = 1 mins 53 secs)
Affordable Housing 2011 Update - Commuted Payments for 2011 (SUPERSEDED 23/05/2012 - please type 'affordable spd' into the search box above to find the latest guidance)
(PDF)
- Size: 8.05 KB
- Estimated download time: (56k = 2 secs)
North Denes Caravan Site - September 2006 (Revised October 2010)
(PDF)
- Size: 494.3 KB
- Estimated download time: (56k = 1 mins 14 secs)
DTZ Employment Land Evidence Base Report
This report presents the employment land evidence base underpinning the Lowestoft and Great Yarmouth Area Action Plans (AAPs).
Evidence base report
(PDF)
- Size: 446.85 KB
- Estimated download time: (56k = 1 mins 6 secs)
PowerPark Demand and Need Report
This document explains the background and vision for the PowerPark, as featured in the Lake Lothing and Outer Harbour Area Action Plan.
View the report
(PDF)
- Size: 1.97 MB
- Estimated download time: (56k = 4 mins 56 secs)
Sub-Regional Housing Strategy
This strategy sets out the main housing issues that affect the Great Yarmouth and Waveney sub-region, and identifies areas where we can add value by acting together.
View the strategy
(PDF)
- Size: 837.88 KB
- Estimated download time: (56k = 2 mins 3 secs)
Waveney Sunrise Coast Tourism Strategy
Setting the agenda for developing tourism in a sustainable way to ensure we are meeting the needs of today's visitor without damaging the needs of our future generations.
Tourism strategy
(PDF)
- Size: 1.48 MB
- Estimated download time: (56k = 3 mins 41 secs)
Waveney Open Space Strategy
This strategy will help shape the management, maintenance and planning of open space in Waveney for the next 10 to 15 years.
View the strategy
(PDF)
- Size: 228.64 KB
- Estimated download time: (56k = 34 secs)
Lowestoft Design Guide
This design guide aims to improve and reinforce the identity of the town by promoting good urban design and developing a robust palette of materials, from surfacing and signage to bollards and benches
Suffolk Rail Strategy
This document outlines a strategy for development of passenger rail services serving Suffolk, also including freight traffic carried by rail.
Rail strategy
(PDF)
- Size: 2.83 MB
- Estimated download time: (56k = 7 mins 5 secs)
Technical note - Lowestoft Highway Scheme Option Testing
This details the assessment work undertaken of the Lowestoft 1st East development proposals and the proposed new crossing of Lake Lothing.
Technical note
(PDF)
- Size: 10.99 MB
- Estimated download time: (56k = 27 mins 26 secs)
A12 Lowestoft Study Lake Lothing Third Crossing Feasibility Study
Preliminary work to help to determine whether a third river crossing and allied infrastructure identified in the Lowestoft Infrastructure Review have the potential to be progressed.
Main document
(PDF)
- Size: 3.75 MB
- Estimated download time: (56k = 9 mins 23 secs)
Appendix A
(PDF)
- Size: 8 MB
- Estimated download time: (56k = 19 mins 59 secs)
Appendix B (part 1)
(PDF)
- Size: 6.88 MB
- Estimated download time: (56k = 17 mins 11 secs)
Appendix B (part 2)
(PDF)
- Size: 8.25 MB
- Estimated download time: (56k = 20 mins 36 secs)
Lowestoft ground conditions study
The study aims to identify the ground conditions that may exist at the site of the URC redevelopment along the corridor of Lake Lothing and environs.
Baseline report
(PDF)
- Size: 279.16 KB
- Estimated download time: (56k = 41 secs)
Baseline Report
This study informs and underlies the Area Action Plan for central Lowestoft. Baseline information will continue to be collected throughout the project and will be fed into the ongoing Masterplan work.
Parts 1 to 15
(PDF)
- Size: 5.01 MB
- Estimated download time: (56k = 12 mins 32 secs)
Part 16
(PDF)
- Size: 8.34 MB
- Estimated download time: (56k = 20 mins 50 secs)
Part 17
(PDF)
- Size: 7.81 MB
- Estimated download time: (56k = 19 mins 30 secs)
Part 18
(PDF)
- Size: 9.76 MB
- Estimated download time: (56k = 24 mins 23 secs)
Parts 19 to 21
(PDF)
- Size: 7.78 MB
- Estimated download time: (56k = 19 mins 26 secs)
Parts 22 to 23
(PDF)
- Size: 10.95 MB
- Estimated download time: (56k = 27 mins 21 secs)
Parts 24 to 32
(PDF)
- Size: 11.34 MB
- Estimated download time: (56k = 28 mins 20 secs)
Parts 33 to 37
(PDF)
- Size: 5.95 MB
- Estimated download time: (56k = 14 mins 53 secs)
Parts 38 to 42
(PDF)
- Size: 10.13 MB
- Estimated download time: (56k = 25 mins 18 secs)
Parts 43 to 60
(PDF)
- Size: 2.65 MB
- Estimated download time: (56k = 6 mins 38 secs)
Parts 61 to 68
(PDF)
- Size: 8.59 MB
- Estimated download time: (56k = 21 mins 27 secs)
Parts 69 to 90
(PDF)
- Size: 7.46 MB
- Estimated download time: (56k = 18 mins 38 secs)
Property Market Baseline Report
Describing the national and local market trends in each of the major sectors of the property market, i.e. offices, industrial and distribution, retail, leisure and residential property.
Baseline report
(PDF)
- Size: 262.97 KB
- Estimated download time: (56k = 39 secs)
Advising on the Potential for Small-Scale Renewable Energy Generation within the URC Area
Providing a baseline assessment of mature small-scale alternative energy generation potential and key enabling actions to support this development in central Lowestoft.
View the document
(PDF)
- Size: 996.99 KB
- Estimated download time: (56k = 2 mins 26 secs)
Outline inspection of quay walls at Lowestoft
An overview of quay walls within the area designated for regeneration in Lowestoft as part of a baseline analysis to support the development of the URC master plan for Great Yarmouth and Lowestoft.
View the document
(PDF)
- Size: 660.35 KB
- Estimated download time: (56k = 1 mins 38 secs)
Translating known market prospects into spatial requirements and implications for ports Infrastructure
Offshore wind / renewable energy report.
View the document
(PDF)
- Size: 806.01 KB
- Estimated download time: (56k = 1 mins 59 secs)
Strategic Framework
This report describes the sub-regional and townscape context of the central Lowestoft Area Action Plan, and sets out strategic and local challenges to guide future development of the Masterplan.
View the framework
(PDF)
- Size: 11.73 MB
- Estimated download time: (56k = 29 mins 18 secs)
Draft Sustainability Appraisal Scoping Report - August 2006
A Sustainability Appraisal Scoping Report was prepared jointly for the Development Management Policies and Site Specific Allocations.
Sustainability Appraisal Scoping Report
(PDF)
- Size: 1.04 MB
- Estimated download time: (56k = 2 mins 36 secs)
Responses and Amendments to the Draft Sustainability Appraisal Scoping Report following consultation
(PDF)
- Size: 123.28 KB
- Estimated download time: (56k = 19 secs)
Strategic Framework
This report describes the sub-regional and townscape context of the URC area, and sets out a number of strategic and local challenges to guide future development of the Masterplan.
Gosford Road, Beccles Revised Development Brief
This development brief helps to guide development on land adjacent to the former Beccles Maltings at Gosford Road, Beccles.
View the Development Brief (Supplementary Planning Guidance No. 7)
(PDF)
- Size: 4.94 MB
- Estimated download time: (56k = 12 mins 21 secs)
Examiner's Report on the Waveney Community Infrastructure Levy
Examiner's Report on the Waveney Community Infrastructure Levy
Examiner's Report
(PDF)
- Size: 135.4 KB
- Estimated download time: (56k = 20 secs)
Contact us
Email: customerservices@waveney.gov.uk
Telephone: 01502 562111
Send your feedback or find key contact details.
